Working with the client, Northern Waste Water Systems (NWWS) replaced the existing wastewater treatment infrastructure and upgraded to a new septic system in Autumn of 2019. The system was designed to meet property requirements and treat wastewater for an actual flow of 190 gal/day. The install by NWWS consisted of a buried 1400 gal septic tank, leachfield dispersal, and a single Standard ClearPod for additional treatment.
ClearPod technology is a robust, drop-in, fixed film aeration unit that takes about 1 hour to install. It decreases the organic loading to the leachfield by 85% but still allows solids to settle due to gentle aeration supplied to the fixed film. By converting the septic tank into a treatment system we improve the quantity of wastewater organic material that might clog the leachfield.